Onarga Christian Church
By James C. Small, minister
The village of Onarga has enjoyed a religious influence since the early days of the settlers who built cabins along Spring Creek. The Methodist society that began in the 1830s continues to meet and minister to the present day. Many religious groups have come to town since then, some flourishing and some folding.
The Spring Creek Church of Christ began east of town in February, 1877 and met for ten years in one of the two schoolhouses that sat at the intersection of 1100 East and 1500 North. Most of the records from this time have been lost. The congregation resolved to belong to no denomination. They wanted to practice the Christian faith as it was presented in the New Testament. They resolved to have no book of doctrine except the Bible, and to accept no creedal statement except this: Jesus is the Christ, the Son of the Living God.
This young church moved into Onarga in 1887, occupying the building recently vacated by the Congregational Church. This building, in the 500 block of West Seminary Avenue, was the first permanent home for the church. They changed their name to the Onarga Church of Christ and began ministry in town.
This congregation was hard-working, and the size of their church family grew to fill the white clapboard building. When gas lights were introduced in the community, the board voted to install them at once. These lights were an improvement over kerosene lamps (not quite as smoky), but they produced just a dim light.
Within a year the electric company offered to connect the electric lines to the church, and the evening service was lit with bulbs having the equivalent of 25 watts of light. The board wondered what to do with the gas lamp fixtures installed just a year previous. After much research, they found no market for these and just threw them away.
The church grew to the point that they decided to build a new church building. The minister at that time, C. E. French, helped lead the church in planning this new building. He announced in October, 1925, that he would be entering the hospital for a minor operation, and when he returned to the church, the building would begin. Unfortunately, he never left the hospital, and the new church building was never built. Instead, the old building was remodeled in 1928, with a new basement, wiring and steam heat installed. Perhaps most innovative, an indoor bathroom was added.
As America approached the 200th anniversary of her independence, the board of the Onarga Christian Church looked for an opportunity to expand. After much discussion, the Blackhawk Presbytery offered to sell the empty Presbyterian building to the Christian Church for the amazing price of $1.00. Negotiations were completed, and summer Vacation Bible School was held in the new old building in 1976. Significant renovations were in order, and the Christian Church replaced the roof, redecorated the interior from top to bottom, replaced the boiler and built a wheel-chair ramp to the main floor.
As the church entered the new century, thoughts turned to a new church building. The church purchased five acres on the west edge of town. Progress has been made in raising a building fund with which to start a new building. The goal was to develop a plan for a building on one level, with suitable space for youth activities and adult studies. The plan adopted by the church board called for a three-phase building program. The first phase would be a 60 foot by 95 foot steel building, with five classrooms, nursery, kitchen, office, two large bathrooms, and a multi-purpose room for worship.
The second phase will be a worship auditorium, capable of seating up to 400 people. When finished, this auditorium will meet the needs of the church and community for many years to come. The multi-purpose room in the first phase will be remodeled for additional classroom space.
The third phase will be additional classrooms, large open room for fellowship, games or large meetings, and additional restrooms. The total floor space of the three phases will be almost 17,000 square feet. A large foyer/entry hall will connect all three phases.
Development of the first phase finally reached the building stage, and on August 22, 2010 the church held a ground-breaking ceremony at 721 West Seminary Avenue. Mayor Mike Tilstra joined leaders from the church board in turning over the first shovels of dirt. Site preparation began in late September, and the foundation was poured in mid-October, 2010. By the end of October the concrete floor was finished and the first steel columns had been raised. The steel skeleton was complete by early December, and the roof was in place before Christmas.
The interior walls are made of 2x4 and 2x6 panels. The wall that encircles the building – the perimeter wall – is composed of 2x4 boards 10 feet tall. The walls dividing the classrooms are all 2x6 construction. All of these walls were constructed in Lexington, KY, at the 2010 National Missionary Convention. The teen session spends part of their weekend building wall panels. The convention took on our church building as their project for the year. They began assembling walls Friday night, Nov. 19, and finished in less than ten hours on Nov. 20. These wall panels were loaded onto two trailers and delivered to Onarga. The convention paid for materials, planning and labor. OCC paid only for the shipping.
